← Back to Latest News
TECH INSIGHT · STORAGE CONTROL

Storage Controller Comparison: Conventional PLC vs. Integrated EMU Terminals

Compare hardware costs, installation efficiency, operational stability and maintenance across PLC-plus-gateway and integrated EMU architectures.

DepcellentTechnical InsightStorage ControllersIntegrated EMU
PLC + GATEWAYVSINTEGRATED EMU
EMU300 · C&I storage controller

Existing official product imagery

Lower hardware procurement costs
40%
Shorter on-site construction time
50%
EMU100 / 300 / 700 / 900
4 series

The 40% and 50% figures are company-supplied test claims. Actual results vary with configuration, protocol integration and site conditions.

On-site data acquisition and control in storage projects generally follow two approaches: a conventional PLC with separate communication gateways, or a purpose-built integrated EMU terminal. Hardware costs, installation efficiency, operational stability and maintenance requirements affect overall project economics.

01

From separate devices to integrated control

Conventional separate-device approach

PLCProtocol converterCommunication gateways
Field equipment: BMS / PCS / inverters

Multiple devices, wiring segments and protocol interfaces

Integrated EMU approach

Purpose-built EMU terminal
Field equipment: BMS / PCS / inverters

RS485 / CAN / Ethernet · Integrated acquisition and control

Architecture illustration only. The device relationships shown are not a project wiring diagram.

The supplied article describes a conventional PLC-plus-gateway solution requiring separate PLCs, protocol converters and gateways, with more device types and field wiring. It highlights potential cross-brand compatibility issues, communication interruptions, packet loss and integration errors, as well as more complex troubleshooting and higher maintenance costs.

02

Compare four practical dimensions

A qualitative comparison of the typical configurations described here, not a universal conclusion about all PLCs or projects.

Dimension
Conventional separate-device approach
Integrated EMU approach
Hardware costs
Conventional separate-device approachSeparate procurement of PLCs, converters and gateways.
Integrated EMU approachIntegrated acquisition and control reduces supporting hardware.
Installation efficiency
Conventional separate-device approachMore device installation, wiring and cross-device commissioning.
Integrated EMU approachFewer devices and connections simplify site work and commissioning.
Operational stability
Conventional separate-device approachCross-brand protocols and communication links add compatibility checks.
Integrated EMU approachNative protocol support and integration can reduce potential failure points.
Ongoing maintenance
Conventional separate-device approachTroubleshooting and coordinating maintenance across multiple devices.
Integrated EMU approachCentralized acquisition and control simplifies maintenance paths.
03

In-house EMU range for diverse energy applications

EMU100 / EMU300 / EMU700 / EMU900: choose the model suited to the project.

The supplied company content presents the EMU100/300/700/900 range as an optimal integrated solution. A terminal integrates common interfaces such as RS485, CAN and Ethernet, supports mainstream BMS, PCS and inverter protocols, and can replace multiple conventional devices in compatible configurations.

RS485CANEthernetBMS / PCS / Inverter

Claims of optimality and complete replacement are company statements, not a universal replacement guarantee. Check model-specific datasheets and project compatibility.

04

Turn hardware integration into project value

The supplied test claims report 40% lower overall hardware procurement costs and 50% shorter on-site construction time with the integrated EMU approach, alongside fewer failure points and improved stability. Applications include C&I storage, industrial park microgrids, distributed PV with storage and utility-scale storage plants.

C&I storageIndustrial park microgridsDistributed PV with storageUtility-scale storage

Project case reference

Source: project cases on this website. Case images and capacities identify the referenced projects; they are not test evidence for the performance claims in this article.